US-40 (SR-40) over ANTELOPE CREEK
10.7MI.EAST of DUCHESNE · County 013, Utah · Built 2004 · 2 Lanes · 5,510 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.154722, -110.207222
This bridge is in worse condition than 31.5% of bridges in County 013. The average bridge in Utah is 0 years old; this one is 22 years old.
Nearby Bridges
COUNTY ROAD over GRAY MOUNTAIN CANAL
Built 1985
COUNTY ROAD over DUCHESNE FEEDER CANAL
Built 1993
COUNTY ROAD over DUCHESNE RIVER
Built 2006
US-40 (SR-40) over GREY MOUNTAIN CANAL
Built 1963
US-40 (SR-40) over BRIDGELAND-MYTON WASH
Built 1954
COUNTY ROAD over LAKE FORK CREEK
Built 2007
ARCADIA RD.FA#1544 over LAKE FORK RIVER
Built 2008
US-40 (SR-40) over DUCHESNE RIVER
Built 1996
US-40 (SR-40) over DRY GULCH CANAL
Built 1958
7000 West over Dry Gulch Creek
Built 2024
Bridge Details
- Structure #
- 0F 690
- Year Built
- 2004
- Length
- 19.8 m (65 ft)
- Max Span
- 19.1 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 5,510
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.