US-40 (SR-40) over COTTONWOOD CREEK
200 No. Main in Roosevelt · County 013, Utah · Built 2011 · 4 Lanes · 15,115 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
40.302022, -109.986878
This bridge is in worse condition than 31.5% of bridges in County 013. The average bridge in Utah is 0 years old; this one is 15 years old.
Nearby Bridges
300 North over Cottonwood Creek
Built 2016
SR-121 over COTTONWOOD CREEK
Built 1950
CITY STREET over DRY GULCH CREEK
Built 2010
US-40 (SR-40) over DRY GULCH CREEK
Built 2001
US-40 (SR-40) over UINTAH RIVER
Built 1960
US-40 (SR-40) over DRY GULCH CANAL
Built 1958
7000 West over Dry Gulch Creek
Built 2024
COUNTY ROAD 2762 over DRY GULCH CREEK
Built 2010
US-40 (SR-40) over DUCHESNE RIVER
Built 1996
SR-121 over 0FLOW CHAN.UINTAH R
Built 1998
Bridge Details
- Structure #
- 0E2630
- Year Built
- 2011
- Length
- 7.8 m (25.6 ft)
- Max Span
- 6.8 m
- Lanes
- 4
- Daily Traffic
- 15,115
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.