N BAYER RD over HOUSTON L&P CANAL
0.75 MI NW OF FM 1405 · County 071, Texas · Built 1970 · 2 Lanes · 2,470 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
29.750661, -94.911203
This bridge is in worse condition than 95% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 56 years old.
Nearby Bridges
FM 1405 over H L & P CANAL
Built 1977
FM 1405 over SUTTON GULLY
Built 1977
W BAY RD over CEDAR BAYOU TRIBUTARY
Built 1965
FERRY RD over POND GULLY
Built 1991
SH 146 over CEDAR BAYOU
Built 1939
Kilgore Road over Drainage Ditch
Built 2008
SH 99 WB over FM 1405
Built 2022
SH 99 EB over FM 1405
Built 2022
FM 1405 over SAW PIT GULLY
Built 1977
RACOON DR over CARY BAYOU
Built 1967
Bridge Details
- Structure #
- 200360AA0365001
- Year Built
- 1970
- Length
- 74.7 m (245.1 ft)
- Max Span
- 9.1 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,470
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.