FM 1405 over H L & P CANAL
2.0 MI S OF FM 565 · County 071, Texas · Built 1977 · 2 Lanes · 8,418 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
29.749417, -94.899169
This bridge is in worse condition than 61.6% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 49 years old.
Nearby Bridges
N BAYER RD over HOUSTON L&P CANAL
Built 1970
FM 1405 over SUTTON GULLY
Built 1977
W BAY RD over CEDAR BAYOU TRIBUTARY
Built 1965
SH 99 SB over CEDAR CROSSING LP RR
Built 2006
SH 99 NB over CEDAR CROSSING LP RR
Built 2006
SH 99 SB over TEXAS GENCO CANAL
Built 2007
SH 99 NB over TEXAS GENCO CANAL
Built 2007
SH 99 SB over CHANNEL E
Built 2007
SH 99 NB over CHANNEL E
Built 2007
FM 1405 over SAW PIT GULLY
Built 1977
Bridge Details
- Structure #
- 200360102402013
- Year Built
- 1977
- Length
- 103.9 m (340.9 ft)
- Max Span
- 7.9 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 2
- Daily Traffic
- 8,418
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.