FM 1405 over SUTTON GULLY
2.9 MI S OF FM 565 · County 071, Texas · Built 1977 · 2 Lanes · 6,755 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
29.738289, -94.909756
This bridge is in worse condition than 61.6% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 49 years old.
Nearby Bridges
W BAY RD over CEDAR BAYOU TRIBUTARY
Built 1965
SH 99 WB over FM 1405
Built 2022
N BAYER RD over HOUSTON L&P CANAL
Built 1970
SH 99 EB over FM 1405
Built 2022
FM 1405 over H L & P CANAL
Built 1977
SH 99 SB over CEDAR CROSSING LP RR
Built 2006
SH 99 NB over CEDAR CROSSING LP RR
Built 2006
Kilgore Road over Drainage Ditch
Built 2008
FERRY RD over POND GULLY
Built 1991
SH 99 ML & FR over CHANNEL F
Built 2006
Bridge Details
- Structure #
- 200360102402012
- Year Built
- 1977
- Length
- 14.6 m (47.9 ft)
- Max Span
- 2.1 m
- Lanes
- 2
- Daily Traffic
- 6,755
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.