IH 10 over COTTON BAYOU
0.2 MI E OF FM 3180 · County 071, Texas · Built 2000 · 6 Lanes · 84,431 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.826456, -94.842733
This bridge is in worse condition than 26.4% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 26 years old.
Nearby Bridges
IH 10 EBFR over COTTON BAYOU
Built 2011
IH 10 WBFR over COTTON BAYOU
Built 2011
IH 10 over FM 3180
Built 2020
LAKES OF CHAMPIONS over COTTON BAYOU
Built 2007
FM 1409 over IH 10
Built 2022
FM 1409 over Drainage Ditch
Built 2021
PERRY AVE over COTTON BAYOU
Built 2015
IH 10 EB FR over HACKBERRY GULLY
Built 2007
IH 10 WB FR over HACKBERRY GULLY
Built 2004
US 99 over OLD NEEDLEPOINT RD
Built 2022
Bridge Details
- Structure #
- 200360050802338
- Year Built
- 2000
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 36 m (118.1 ft)
- Lanes
- 6
- Daily Traffic
- 84,431
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $459,000
- Total Project Cost
- $574,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.