US 99 over OLD NEEDLEPOINT RD
0.55 MI SE OF IH 10 · County 071, Texas · Built 2022 · 2 Lanes · 8,597 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.816964, -94.862056
This bridge is in worse condition than 19.5% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
IH 10 EB FR over HACKBERRY GULLY
Built 2007
IH 10 WB FR over HACKBERRY GULLY
Built 2004
SH 99 over IH 10
Built 2022
IH 10 over SH 99 & HACKBERRY GULLY
Built 2007
IH 10 over BARBERS CANAL
Built 1948
SH 99 SB over KILGORE RD
Built 2022
SH 99 NB over KILGORE RD
Built 2022
LANGSTON BOULEVARD over HACKBERRY PARK LAKE
Built 2021
FM 3180 over HACKBERRY GULLY
Built 1975
LANGSTON BLVD over HACKBERRY GULLY
Built 2021
Bridge Details
- Structure #
- 200360351010274
- Year Built
- 2022
- Length
- 32 m (105 ft)
- Max Span
- 32 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,597
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.