SH 99 SB over KILGORE RD
1.61 MI N OF IH 10 · County 071, Texas · Built 2022 · 2 Lanes · 4,298 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.803431, -94.868175
This bridge is in worse condition than 19.5% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
SH 99 NB over KILGORE RD
Built 2022
US 99 over OLD NEEDLEPOINT RD
Built 2022
FM 3180 over HACKBERRY GULLY
Built 1975
SH 99 NB over FM 565
Built 2007
SH 99 SB over FM 565
Built 2007
KILGORE PKWY over DRAINAGE DITCH
Built 2014
FM 565 over CWA CANAL
Built 1970
IH 10 over BARBERS CANAL
Built 1948
IH 10 over SH 99 & HACKBERRY GULLY
Built 2007
SH 99 over IH 10
Built 2022
Bridge Details
- Structure #
- 200360351010266
- Year Built
- 2022
- Length
- 35.1 m (115.2 ft)
- Max Span
- 35.1 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,298
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.