FM 1409 over IH 10
0.85 MI E OF FM 3130 · County 071, Texas · Built 2022 · 2 Lanes · 9,483 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.827342, -94.832417
This bridge is in worse condition than 19.5% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
FM 1409 over Drainage Ditch
Built 2021
IH 10 WBFR over COTTON BAYOU
Built 2011
IH 10 EBFR over COTTON BAYOU
Built 2011
IH 10 over COTTON BAYOU
Built 2000
LAKES OF CHAMPIONS over COTTON BAYOU
Built 2007
IH 10 over FM 3180
Built 2020
PERRY AVE over COTTON BAYOU
Built 2015
FM 565 over COTTON BAYOU
Built 2001
FM 3180 over HACKBERRY GULLY
Built 1975
FM 565 over HACKBERRY GULLY
Built 2001
Bridge Details
- Structure #
- 200360050802474
- Year Built
- 2022
- Length
- 152.4 m (500 ft)
- Max Span
- 25.9 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 9,483
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.