SH 34 over US 80 UPRR GROVE ST

INT of SH 34 & US 80 · County 257, Texas · Built 2013 · 4 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
181300009504406
Year Built
2013
Length
342.3 m (1123 ft)
Max Span
45.7 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.