US 80 over KINGS CREEK RELIEF

1.0 MI E OF SH 34 · County 257, Texas · Built 1923 · 4 Lanes · 11,508 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
181300009505059
Year Built
1923
Reconstructed
1962
Length
13.7 m (44.9 ft)
Max Span
3 m
Width
27.3 m (89.6 ft)
Lanes
4
Daily Traffic
11,508
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.