US 80 over DRAW

0.50 MI E OF SH 205 · County 257, Texas · Built 1925 · 4 Lanes · 33,452 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
181300009504026
Year Built
1925
Reconstructed
1960
Length
6.7 m (22 ft)
Max Span
3 m
Width
24.8 m (81.4 ft)
Lanes
4
Daily Traffic
33,452
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.