PAIGE RD over STONEBRIAR CREEK TRIB
0.40 MI S N COLONY BLVD · County 121, Texas · Built 2008 · 6 Lanes · 12,415 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.09285, -96.875911
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 18 years old.
Nearby Bridges
MILLER DR over STONEBRIAR CREEK TRIB
Built 1979
N COLONY BLVD over STONEBRIAR CREEK TRIB
Built 2011
TAYLOR RD over STONEBRIAR CREEK TRIB
Built 1979
SQUIRES DR over STONEBRIAR CREEK TRIB
Built 1979
N COLONY BLVD over STONEBRIAR CREEK TRIB
Built 1985
FM 423 (MAIN ST) over DRAW
Built 2016
PAIGE ROAD over OFFICE CREEK
Built 2003
Colony Blvd W CONN over SH 121 SB On-Ramp
Built 2015
Colony Blvd N CONN over SH 121 SB On-Ramp
Built 2015
S Colony Blvd over SH 121
Built 2016
Bridge Details
- Structure #
- 180610MM0245001
- Year Built
- 2008
- Length
- 8.8 m (28.9 ft)
- Max Span
- 2.7 m
- Width
- 31.1 m (102 ft)
- Lanes
- 6
- Daily Traffic
- 12,415
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $21,000
- Total Project Cost
- $26,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.