FM 423 (MAIN ST) over DRAW

1.40 MI N OF SH 121 · County 121, Texas · Built 2016 · 6 Lanes · 51,932 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180610156702023
Year Built
2016
Length
20.1 m (65.9 ft)
Max Span
3 m
Width
46.6 m (152.9 ft)
Lanes
6
Daily Traffic
51,932
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.