S County Line Rd over Trib Harriet Creek
3.2 Mi N of SH 114 · County 121, Texas · Built 2020 · 2 Lanes · 88 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.082689, -97.391156
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
CO. RD. 4717 PCT 1 over HARRIET CREEK
Built 1987
S COUNTY LINE RD over HARRIET CREEK
Built 2010
S County Line Rd over Harriet Creek Relief
Built 2020
FM 407 over CURRY BRANCH
Built 1953
FM 407 over TRAIL CREEK
Built 2013
Oliver Creek Rd over Oliver Creek
Built 2012
S County Line Rd over Trib Elizabeth Creek
Built 2020
CR4733/HCKRY PCT 1 over ELIZABETH CREEK
Built 1997
Willow Bend Dr W over Trib Elizabeth Creek
Built 1986
SH 114 WB over ELIZABETH CREEK
Built 2007
Bridge Details
- Structure #
- 180610AA0548004
- Year Built
- 2020
- Length
- 15.2 m (49.9 ft)
- Max Span
- 3 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 88
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.