S COUNTY LINE RD over HARRIET CREEK
2.00 MI N OF SH 114 · County 121, Texas · Built 2010 · 2 Lanes · 324 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.065061, -97.391333
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 16 years old.
Nearby Bridges
S County Line Rd over Harriet Creek Relief
Built 2020
S County Line Rd over Trib Harriet Creek
Built 2020
CO. RD. 4717 PCT 1 over HARRIET CREEK
Built 1987
S County Line Rd over Trib Elizabeth Creek
Built 2020
Willow Bend Dr W over Trib Elizabeth Creek
Built 1986
SH 114 WB over ELIZABETH CREEK
Built 2007
SH 114 EB over ELIZABETH CREEK
Built 2005
SH 114 WB over ALLEN BRANCH
Built 2015
SH 114 EB over ALLEN BRANCH
Built 2015
JOHN DAY RD over ELIZABETH CREEK
Built 2011
Bridge Details
- Structure #
- 180610AA0548001
- Year Built
- 2010
- Length
- 10.7 m (35.1 ft)
- Max Span
- 3 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 324
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.