CO. RD. 4717 PCT 1 over HARRIET CREEK
1.3 MI. S. OF FM 407 · County 497, Texas · Built 1987 · 2 Lanes · 403 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.079378, -97.411236
This bridge is in worse condition than 93.6% of bridges in County 497. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
S County Line Rd over Trib Harriet Creek
Built 2020
S COUNTY LINE RD over HARRIET CREEK
Built 2010
S County Line Rd over Harriet Creek Relief
Built 2020
CR4733/HCKRY PCT 1 over ELIZABETH CREEK
Built 1997
S County Line Rd over Trib Elizabeth Creek
Built 2020
SH 114 WB over ELIZABETH CREEK
Built 2007
SH 114 EB over ELIZABETH CREEK
Built 2005
Willow Bend Dr W over Trib Elizabeth Creek
Built 1986
FM 407 over CURRY BRANCH
Built 1953
COUNTY ROAD 274 over US 81/287
Built 1972
Bridge Details
- Structure #
- 022490AA0270001
- Year Built
- 1987
- Length
- 12.2 m (40 ft)
- Max Span
- 12.2 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 403
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.