IH 35 NBFR over ELIZABETH CREEK

0.9 MI S OF SH 114 · County 121, Texas · Built 2019 · 2 Lanes · 30,109 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180610008113328
Year Built
2019
Length
242 m (794 ft)
Max Span
38.2 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
30,109
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.