IH 35W NBML over SH 114
3.28 MI SW OF FM 1171 · County 121, Texas · Built 1969 · 2 Lanes · 22,976 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.026539, -97.27325
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 57 years old.
Nearby Bridges
IH 35W SBML over SH 114
Built 1969
IH 35W SB OFF-RP over SH 114
Built 2018
IH35W ML FR SH114 over PETERSONS DRAW
Built 1966
LABONTE LANE over DRAINAGE DITCH
Built 1996
ELIZABETH CEM RD over ELIZABETH CREEK
Built 1989
ALLISON AVE over DRAINAGE DITCH
Built 1996
VICTORY CIRCLE over DRAINAGE DITCH
Built 1996
IH 35 NBFR over ELIZABETH CREEK
Built 2019
IH 35W NBML over ELIZABETH CREEK
Built 1966
IH 35W SBML over ELIZABETH CREEK
Built 1966
Bridge Details
- Structure #
- 180610008113153
- Year Built
- 1969
- Length
- 91.4 m (299.9 ft)
- Max Span
- 24.4 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 22,976
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.