IH 35W SBML over ELIZABETH CREEK

0.90 MI S OF SH 114 · County 121, Texas · Built 1966 · 2 Lanes · 33,691 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
180610008113071
Year Built
1966
Length
178.3 m (585 ft)
Max Span
12.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
33,691
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.