FOREST LN EB over FLOYD BRANCH
0.5 MI E OF US 75 · County 113, Texas · Built 1985 · 3 Lanes · 8,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.909125, -96.759922
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 41 years old.
Nearby Bridges
FOREST LANE WB over FLOYD BRANCH
Built 1985
FOREST LANE over BNSF RR
Built 1955
TI BLVD over FLOYD BRANCH
Built 1985
FOREST LANE WB over COTTONWOOD CREEK
Built 1985
FOREST LANE EB over COTTONWOOD CREEK
Built 1981
US 75 NB OFF RAMP over US 75 & FOREST LN
Built 1992
US 75 over FOREST LN
Built 1983
US 75 SB ON RAMP over US 75 SB FR
Built 1992
US 75 over WHITE ROCK CREEK
Built 1950
US 75 NB FR over WHITE ROCK CREEK
Built 1991
Bridge Details
- Structure #
- 1805709F6680011
- Year Built
- 1985
- Length
- 74.7 m (245.1 ft)
- Max Span
- 13.4 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 3
- Daily Traffic
- 8,300
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,000
- Total Project Cost
- $20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.