US 75 NB FR over WHITE ROCK CREEK

3.05 MI N OF LP 12 · County 113, Texas · Built 1991 · 2 Lanes · 9,178 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570004707304
Year Built
1991
Length
64.6 m (211.9 ft)
Max Span
17.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
9,178
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.