TI BLVD over FLOYD BRANCH
0.2 MI N OF FOREST LANE · County 113, Texas · Built 1985 · 4 Lanes · 8,287 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.911089, -96.758064
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 41 years old.
Nearby Bridges
FOREST LANE WB over FLOYD BRANCH
Built 1985
FOREST LN EB over FLOYD BRANCH
Built 1985
FOREST LANE over BNSF RR
Built 1955
FOREST LANE WB over COTTONWOOD CREEK
Built 1985
FOREST LANE EB over COTTONWOOD CREEK
Built 1981
MARKVILLE DR over FLOYD BRANCH
Built 2000
US 75 NB OFF RAMP over US 75 & FOREST LN
Built 1992
US 75 over FOREST LN
Built 1983
US 75 SB ON RAMP over US 75 SB FR
Built 1992
CHURCHILL WAY over US 75
Built 2010
Bridge Details
- Structure #
- 1805709F5680001
- Year Built
- 1985
- Length
- 49.7 m (163.1 ft)
- Max Span
- 12.5 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 4
- Daily Traffic
- 8,287
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $14,000
- Total Project Cost
- $18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.