DALLAS NO. TOLLWAY over FOREST LANE

1.2 MI S OF LBJ FREEWAY · County 113, Texas · Built 1966 · 6 Lanes · 125,690 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
1805709D0470025
Year Built
1966
Reconstructed
1983
Length
52.4 m (171.9 ft)
Max Span
18 m
Width
32.2 m (105.6 ft)
Lanes
6
Daily Traffic
125,690
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.