DALLAS NO TOLLWAY over INWOOD ROAD NB

0.1 MI S OF HARVEST HILL · County 113, Texas · Built 1966 · 6 Lanes · 88,214 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1805709D0470009
Year Built
1966
Reconstructed
1983
Length
58.5 m (191.9 ft)
Max Span
23.2 m
Width
31.5 m (103.3 ft)
Lanes
6
Daily Traffic
88,214
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.