IH 635 TEXpress over Dallas North Tollway

IH 635 @ DNT · County 113, Texas · Built 2014 · 6 Lanes · 309,861 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570237401598
Year Built
2014
Length
48.8 m (160.1 ft)
Max Span
24.4 m
Width
31.7 m (104 ft)
Lanes
6
Daily Traffic
309,861
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.