DALLAS NO TOLLWAY over HARVEST HILL RD

0.3 MI S OF LBJ FREEWAY · County 113, Texas · Built 1983 · 8 Lanes · 88,214 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1805709D0470007
Year Built
1983
Length
43.9 m (144 ft)
Max Span
17.1 m
Width
43 m (141.1 ft)
Lanes
8
Daily Traffic
88,214
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$320,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.