US 75 SB FR over US 75 SB EXIT TO LP 12

0.15 MI N OF LP 12 · County 113, Texas · Built 1998 · 2 Lanes · 70,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570004707367
Year Built
1998
Length
108.5 m (356 ft)
Max Span
29 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
70,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,000
Total Project Cost
$24,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.