LOOP 12 EB over US 75
6.80 MI N OF IH 30 · County 113, Texas · Built 1998 · 6 Lanes · 26,905 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
32.865286, -96.770419
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 28 years old.
Nearby Bridges
LOOP 12 WB over US 75
Built 1998
US 75 SB ON RAMP F over US 75 OFF RAMP I & SB FR
Built 1998
US 75 NB ON RAMP N over US 75 NB FR
Built 1998
US 75 NB FR over US 75 NB EXIT TO LP 12
Built 1998
Greenville Ave over LP 12
Built 1992
US 75 SB FR over US 75 SB EXIT TO LP 12
Built 1998
NORTHPARK BLVD over US 75
Built 1999
CARUTH HAVEN ST WB over US 75
Built 1998
CARUTH HAVEN ST EB over US 75
Built 1998
US 75 SB ON RAMP K over US 75 SB OFF RAMP M
Built 1999
Bridge Details
- Structure #
- 180570004707362
- Year Built
- 1998
- Length
- 107.3 m (352 ft)
- Max Span
- 36.3 m
- Width
- 25.4 m (83.3 ft)
- Lanes
- 6
- Daily Traffic
- 26,905
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.