US 75 NB ON RAMP N over US 75 NB FR

0.05 MI N OF LP 12 · County 113, Texas · Built 1998 · 2 Lanes · 70,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570004707366
Year Built
1998
Length
54.6 m (179.1 ft)
Max Span
31.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
70,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.