DN TOLLWAY NBFR over STEWART CREEK
0.60 MI S OF FM 720 · County 085, Texas · Built 1998 · 2 Lanes · 5,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
33.143656, -96.838728
This bridge is in worse condition than 98.8% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 28 years old.
Nearby Bridges
DN TOLLWAY NBML over STEWART CREEK
Built 2007
DN TOLLWAY SBML over STEWART CREEK
Built 2007
DN TOLLWAY SBFR over STEWART CREEK
Built 1998
DN TOLLWAY NB over COTTON GIN RD
Built 2007
DN TOLLWAY SB over COTTON GIN RD
Built 2007
DNT NBML over BNSF RAILROAD
Built 2007
DN TOLLWAY SBFR over DRAW
Built 1997
DNT SBML over BNSF RAILROAD
Built 2007
DALLAS PKWY NBFR over DRAW
Built 1997
DN TOLLWAY SB over MAIN ST
Built 2007
Bridge Details
- Structure #
- 180430J00445005
- Year Built
- 1998
- Length
- 182.9 m (600.1 ft)
- Max Span
- 12.2 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 5,500
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $35,000
- Total Project Cost
- $44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.