DN TOLLWAY NBFR over STEWART CREEK

0.60 MI S OF FM 720 · County 085, Texas · Built 1998 · 2 Lanes · 5,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
180430J00445005
Year Built
1998
Length
182.9 m (600.1 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
5,500
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$35,000
Total Project Cost
$44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.