DN TOLLWAY SB over COTTON GIN RD
0.5 MI S OF MAIN STREET · County 085, Texas · Built 2007 · 3 Lanes · 50,558 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.145814, -96.839394
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 19 years old.
Nearby Bridges
DN TOLLWAY NB over COTTON GIN RD
Built 2007
DN TOLLWAY NBFR over STEWART CREEK
Built 1998
DN TOLLWAY SBML over STEWART CREEK
Built 2007
DN TOLLWAY NBML over STEWART CREEK
Built 2007
DN TOLLWAY SBFR over STEWART CREEK
Built 1998
DN TOLLWAY SB over MAIN ST
Built 2007
DN TOLLWAY NB over MAIN ST
Built 2007
DNT NBML over BNSF RAILROAD
Built 2007
MAIN ST CROSSOVER over TRIB COTTONWOOD BRANCH
Built 2009
MAIN ST CROSSOVER over TRIB COTTONWOOD BRANCH
Built 2009
Bridge Details
- Structure #
- 1804309D0470042
- Year Built
- 2007
- Length
- 79.6 m (261.2 ft)
- Max Span
- 32.6 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 3
- Daily Traffic
- 50,558
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.