DN TOLLWAY NBML over STEWART CREEK

0.6 MI S OF MAIN STREET · County 085, Texas · Built 2007 · 3 Lanes · 50,558 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1804309D0470039
Year Built
2007
Length
240.8 m (790 ft)
Max Span
35.1 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
50,558
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.