FM 2096 over Mineral Creek Relief

2.5 MI N OF US 79 · County 395, Texas · Built 1955 · 2 Lanes · 146 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
171980195401001
Year Built
1955
Length
22.9 m (75.1 ft)
Max Span
7.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
146
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$358,000
Total Project Cost
$537,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.