FM 2096 over DUCK CREEK RELIEF
4.3 MI S OF FM 979 · County 395, Texas · Built 1955 · 2 Lanes · 146 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.172669, -96.417461
This bridge is in worse condition than 29.8% of bridges in County 395. The average bridge in Texas is 0 years old; this one is 71 years old.
Nearby Bridges
FM 2096 over DUCK CREEK
Built 1955
FM 979 over DUCK CREEK
Built 1958
FM 2096 over Mineral Creek Relief
Built 1955
FM 2096 over Mineral Creek
Built 1955
KITTY KAT LN CR385 over TRIB OF N MINERAL CR
Built 2004
CR 385 over DRAW
Built 2003
US 79 over DUCK CREEK
Built 1959
US 79 over DUCK CREEK RELIEF
Built 1959
CR 384 over NORTH MINERAL CR
Built 1940
COLE BRANCH RD over STEELE CREEK
Built 2017
Bridge Details
- Structure #
- 171980195401003
- Year Built
- 1955
- Length
- 22.9 m (75.1 ft)
- Max Span
- 7.6 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 146
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $269,000
- Total Project Cost
- $404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.