PUCKETT RANCH RD over SOUTH MINERAL CREEK
1.8 MI NE OF US 79 · County 395, Texas · Built 2008 · 2 Lanes · 72 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.073269, -96.434108
This bridge is in worse condition than 53.2% of bridges in County 395. The average bridge in Texas is 0 years old; this one is 18 years old.
Nearby Bridges
CR 346 (CASEY LP) over S MINERAL CK TRIB
Built 2023
US 79 over MINERAL CREEK
Built 1959
MCCORMICK RD over SOUTH MINERAL CREEK
Built 2008
US 79 over MINERAL CREEK BRANCH
Built 1959
CR 385 over DRAW
Built 2003
CR 384 over NORTH MINERAL CR
Built 1940
CAMP CR CEMETRY RD over CAMP CREEK
Built 1940
FM 46 over CEDAR CREEK
Built 2025
OLD HICKORY GROVE over ROCKY BRANCH
Built 2007
KITTY KAT LN CR385 over TRIB OF N MINERAL CR
Built 2004
Bridge Details
- Structure #
- 171980AA0353001
- Year Built
- 2008
- Length
- 18.3 m (60 ft)
- Max Span
- 18 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 72
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000