CR 326 over SAN ANTONIO RIVER
4.4 MI W OF CR 336 · County 255, Texas · Built 1973 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
28.886839, -97.787217
This bridge is in worse condition than 98.6% of bridges in County 255. The average bridge in Texas is 0 years old; this one is 53 years old.
Nearby Bridges
CR 326 over ECLETO CREEK
Built 1976
FM 81 over Ecleto Creek
Built 2023
CR 326 over DRAW
Built 1999
FM 81 over DRAW
Built 1940
CR 326 over DRY ESCONDIDO CREEK
Built 1970
FM 792 over DRAW
Built 1939
CR 335 over SALT CREEK
Built 2007
FM 792 over DRY ESCONDIDO CREEK
Built 1949
FM 81 over SALT CREEK
Built 2024
FM 792 over DRAW
Built 1939
Bridge Details
- Structure #
- 161290AA0326003
- Year Built
- 1973
- Length
- 124.4 m (408.1 ft)
- Max Span
- 25.9 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $610,000
- Total Project Cost
- $762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.