FM 81 over Ecleto Creek
4.0 MI SE OF SH 80 · County 255, Texas · Built 2023 · 2 Lanes · 1,238 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
28.920142, -97.772689
This bridge is in worse condition than 67.6% of bridges in County 255. The average bridge in Texas is 0 years old; this one is 3 years old.
Nearby Bridges
FM 81 over DRAW
Built 1940
CR 335 over SALT CREEK
Built 2007
FM 81 over SALT CREEK
Built 2024
CR 326 over ECLETO CREEK
Built 1976
CR 326 over SAN ANTONIO RIVER
Built 1973
CR 326 over DRAW
Built 1999
FM 81 over DRAW
Built 1940
CR 319 over SALT CREEK
Built 2006
FM 81 over Draw
Built 2024
CR 302 over DRAW
Built 1989
Bridge Details
- Structure #
- 161290069101016
- Year Built
- 2023
- Length
- 96 m (315 ft)
- Max Span
- 16.8 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,238
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.