FM 81 over DRAW
4.8 MI SE OF SH 80 · County 255, Texas · Built 1940 · 2 Lanes · 2,416 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
28.921133, -97.759042
This bridge is in worse condition than 44.8% of bridges in County 255. The average bridge in Texas is 0 years old; this one is 86 years old.
Nearby Bridges
FM 81 over Ecleto Creek
Built 2023
CR 335 over SALT CREEK
Built 2007
FM 81 over SALT CREEK
Built 2024
CR 326 over ECLETO CREEK
Built 1976
CR 326 over DRAW
Built 1999
CR 319 over SALT CREEK
Built 2006
FM 81 over Draw
Built 2024
CR 326 over SAN ANTONIO RIVER
Built 1973
FM 2773 over DRAW
Built 1964
CR 302 over MCTENNEL CREEK
Built 2005
Bridge Details
- Structure #
- 161290069101009
- Year Built
- 1940
- Reconstructed
- 2022
- Length
- 12.9 m (42.3 ft)
- Max Span
- 1.8 m
- Width
- 15 m (49.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,416
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.