SH 80 over SAN ANTONIO RIVER
1.3 MI SW OF FM 81 · County 255, Texas · Built 1930 · 2 Lanes · 3,775 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
28.937761, -97.834575
This bridge is in worse condition than 67.6% of bridges in County 255. The average bridge in Texas is 0 years old; this one is 96 years old.
Nearby Bridges
SH 80 over SAN ANTONIO RIVER RELIEF
Built 1949
SH 80 over SAN ANTONIO RIVER DRAW
Built 1929
FM 792 over DRAW
Built 1939
SH 80 over SAN ANTONIO RIVER DRAW
Built 1929
FM 81 over DRAW
Built 1940
FM 792 over DRAW
Built 1939
CR 302 over DRAW
Built 1989
FM 81 over CIBOLO CREEK
Built 1986
FM 81 over PANNA MARIA CREEK
Built 1951
FM 81 over Ecleto Creek
Built 2023
Bridge Details
- Structure #
- 161290034804011
- Year Built
- 1930
- Reconstructed
- 1971
- Length
- 150.3 m (493.1 ft)
- Max Span
- 23.2 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,775
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.