SH 80 over SAN ANTONIO RIVER RELIEF
0.9 MI SW OF FM 81 · County 255, Texas · Built 1949 · 2 Lanes · 4,292 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
28.942275, -97.831469
This bridge is in worse condition than 67.6% of bridges in County 255. The average bridge in Texas is 0 years old; this one is 77 years old.
Nearby Bridges
SH 80 over SAN ANTONIO RIVER DRAW
Built 1929
SH 80 over SAN ANTONIO RIVER
Built 1930
SH 80 over SAN ANTONIO RIVER DRAW
Built 1929
FM 792 over DRAW
Built 1939
FM 81 over DRAW
Built 1940
CR 302 over DRAW
Built 1989
FM 792 over DRAW
Built 1939
FM 81 over CIBOLO CREEK
Built 1986
CR 295 over Ecleto Creek
Built 1990
FM 81 over PANNA MARIA CREEK
Built 1951
Bridge Details
- Structure #
- 161290034804018
- Year Built
- 1949
- Reconstructed
- 1971
- Length
- 48.8 m (160.1 ft)
- Max Span
- 9.1 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,292
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.