CR 124 over PECAN BRANCH
0.6 MI S OF FM 971 · County 491, Texas · Built 1990 · 2 Lanes · 450 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
30.677117, -97.542753
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
FM 971 over MILEHAM BRANCH
Built 1969
CR 124 over MILAN BRANCH
Built 1994
CR126 over DRAW
Built 2006
FM 971 over DRAW
Built 1969
CR 121 over MILEHAM BRANCH
Built 2005
CR 192 over PECAN BRANCH
Built 1952
CR 155 over WEIR BRANCH
Built 1990
FM 971 over WEIR BRANCH
Built 1969
CR 120 over WEIR BRANCH
Built 2006
CR 333 over OPOSSUM CREEK
Built 1990
Bridge Details
- Structure #
- 142460AA0278004
- Year Built
- 1990
- Length
- 11 m (36.1 ft)
- Max Span
- 5.2 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 450
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.