CR 120 over WEIR BRANCH
0.30 MI S OF FM 971 · County 491, Texas · Built 2006 · 2 Lanes · 1,356 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.670361, -97.584108
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 20 years old.
Nearby Bridges
FM 971 over WEIR BRANCH
Built 1969
FM 971 over BOTTOM CREEK
Built 1964
CR 124 over MILAN BRANCH
Built 1994
CR 155 over WEIR BRANCH
Built 1990
CR 121 over MILEHAM BRANCH
Built 2005
FM 1105 over DRAW
Built 1965
SH 29 over SAN GABRIEL RIVER
Built 1959
FM 971 over MILEHAM BRANCH
Built 1969
FM 971 over RANGER BRANCH
Built 1964
FM 971 over BERRY CREEK
Built 1969
Bridge Details
- Structure #
- 142460N00005001
- Year Built
- 2006
- Length
- 16.2 m (53.1 ft)
- Max Span
- 3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,356
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,000
- Total Project Cost
- $6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.