FM 971 over MILEHAM BRANCH
8.30 MI W OF SH 95 · County 491, Texas · Built 1969 · 2 Lanes · 1,899 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.680853, -97.557806
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 57 years old.
Nearby Bridges
CR 124 over MILAN BRANCH
Built 1994
CR 124 over PECAN BRANCH
Built 1990
CR 155 over WEIR BRANCH
Built 1990
FM 971 over WEIR BRANCH
Built 1969
CR 121 over MILEHAM BRANCH
Built 2005
CR 120 over WEIR BRANCH
Built 2006
CR126 over DRAW
Built 2006
FM 1105 over DRAW
Built 1965
FM 971 over BOTTOM CREEK
Built 1964
FM 971 over DRAW
Built 1969
Bridge Details
- Structure #
- 142460269001010
- Year Built
- 1969
- Reconstructed
- 2022
- Length
- 13.7 m (44.9 ft)
- Max Span
- 2.7 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,899
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.