CLEAR LAKE CITY EB over HCFCD DITCH L

0.2 MI SW OF SPACE CENTER · County 201, Texas · Built 1992 · 2 Lanes · 12,863 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
121020B14935004
Year Built
1992
Length
28 m (91.9 ft)
Max Span
9.1 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
12,863
Material
Prestressed Concrete
Design
Other
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.