BAY OAKS BLVD over DRAW
0.6 MI SE OF CL CITY BLVD · County 201, Texas · Built 1990 · 4 Lanes · 2,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.592675, -95.128472
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
PINELOCH DR over HORSEPEN BAYOU
Built 1990
CLEAR LAKE CITY WB over HORSEPEN BAYOU
Built 1993
CLEAR LAKE CITY EB over HORSEPEN BAYOU
Built 1993
CLEAR LAKE CITY WB over HCFCD DITCH L
Built 1992
CLEAR LAKE CITY EB over HCFCD DITCH L
Built 1992
SPACE CTR BLVD WB over HORSEPEN BAYOU
Built 1995
SPACE CTR BLVD EB over HORSEPEN BAYOU
Built 1995
SPACE CTR BLVD WB over HCFCD DITCH
Built 1985
SPACE CTR BLVD EB over HCFCD DITCH
Built 1978
WHITLOCK DR over HCFCD DITCH
Built 1990
Bridge Details
- Structure #
- 121020B06041001
- Year Built
- 1990
- Length
- 40.5 m (132.9 ft)
- Max Span
- 13.1 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 4
- Daily Traffic
- 2,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,000
- Total Project Cost
- $14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.