CLEAR LAKE CITY WB over HCFCD DITCH M
0.4 MI NE OF SH 3 · County 201, Texas · Built 1992 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.581222, -95.150442
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 34 years old.
Nearby Bridges
CLEAR LAKE CITY EB over HCFCD DITCH M
Built 1992
SH 3 over Horsepen Bayou
Built 2008
WHITLOCK DR over HCFCD DITCH
Built 1990
CLEAR LAKE CITY EB over HCFCD DITCH L
Built 1992
CLEAR LAKE CITY WB over HCFCD DITCH L
Built 1992
EL CAMINO REAL EB over HCFCD DITCH
Built 1985
EL CAMINO REAL WB over HCFCD DITCH
Built 1975
SPACE CTR BLVD WB over HORSEPEN BAYOU
Built 1995
SPACE CTR BLVD EB over HORSEPEN BAYOU
Built 1995
PEBBLESHIRE DR over HCFCD DITCH
Built 1978
Bridge Details
- Structure #
- 121020B14935001
- Year Built
- 1992
- Length
- 25.6 m (84 ft)
- Max Span
- 8.5 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.