PEBBLESHIRE DR over HCFCD DITCH
0.4 MI W OF EL CAMINO · County 201, Texas · Built 1978 · 2 Lanes · 2,570 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
29.567939, -95.139367
This bridge is in worse condition than 93.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
EL CAMINO REAL EB over HCFCD DITCH
Built 1985
EL CAMINO REAL WB over HCFCD DITCH
Built 1975
PENN HILLS LN over HCFCD DITCH
Built 1976
CLEAR LAKE CITY WB over HCFCD DITCH M
Built 1992
SPACE CTR BLVD EB over HCFCD DITCH
Built 1978
SPACE CTR BLVD WB over HCFCD DITCH
Built 1985
RAMADA DR over HCFCD DITCH
Built 1970
CLEAR LAKE CITY EB over HCFCD DITCH M
Built 1992
RESEDA DR over HCFCD DITCH
Built 1965
WHITLOCK DR over HCFCD DITCH
Built 1990
Bridge Details
- Structure #
- 121020B50563545
- Year Built
- 1978
- Length
- 31.4 m (103 ft)
- Max Span
- 12.2 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,570
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.