BAY AREA BLVD EB over HCFCD DITCH
0.1 MI SW OF EL CAMINO · County 201, Texas · Built 1966 · 3 Lanes · 5,470 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.553475, -95.121936
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 60 years old.
Nearby Bridges
BAY AREA BLVD WB over HCFCD DITCH
Built 1966
GEMINI AVE over HCFCD DITCH
Built 1983
RAMADA DR over HCFCD DITCH
Built 1970
FEATHER CRAFT LN over HCFCD DITCH
Built 1986
MEDICAL CTR BLVD over HCFCD DITCH
Built 1983
SH 3 over COW BAYOU
Built 1925
EL CAMINO REAL over COW BAYOU & CANAL
Built 2011
RESEDA DR over HCFCD DITCH
Built 1965
E. Nasa Pkwy over HL&P DISCHARGE DITCH #1
Built 1960
NASA RD 1 over SARAH DEEL DR
Built 2008
Bridge Details
- Structure #
- 121020B06029001
- Year Built
- 1966
- Reconstructed
- 1990
- Length
- 25.6 m (84 ft)
- Max Span
- 8.5 m
- Width
- 12.8 m (42 ft)
- Lanes
- 3
- Daily Traffic
- 5,470
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.