GEMINI AVE over HCFCD DITCH

.1MI E OF FEATHER CRAFT · County 201, Texas · Built 1983 · 4 Lanes · 1,596 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
121020AA3268001
Year Built
1983
Length
29 m (95.1 ft)
Max Span
9.8 m
Width
18.3 m (60 ft)
Lanes
4
Daily Traffic
1,596
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$9,000
Total Project Cost
$11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.